Orgalime contribution to the Commission consultation on certification for waste treatment facilities

Published: 17 March 2014

Policies & Issues: Environment

Orgalime, as the voice of European metalworking, mechanical engineering, electrical and electronic engineering industries, thanks the Commission for consulting stakeholders on the issue of certification for waste treatment facilities. 

We would like to provide our comments to the debate, which reflect our industry’s experience with the implementation of the waste stream specific Directive 2012/19/EU (repealing 2002/96/EC) on Waste Electrical and Electronic Equipment (WEEE) [see more in download]

Related Position Papers

Environment: Orgalim preliminary key messages for the upcoming revision of the EU Waste Framework Directive Orgalim [11 August 2022]

Environment: Position and recommendations from Europe’s technology industries on the proposed Ecodesign for Sustainable Products Regulation [1 June 2022]

Environment: Orgalim position paper on the upcoming revision of the RoHS Directive [31 May 2022]

Environment: Orgalim position on the upcoming revision of the REACH Regulation [13 April 2022]

Environment: Orgalim Position Paper on the “right to repair” [5 April 2022]

Environment: Orgalim Position Paper on the restriction of PFAS [27 January 2022]

Environment: Orgalim Position Paper on the draft French Decree on consumer information for waste-generating products [21 December 2021]

Environment: Joint industry position paper on the concept of Essential Use [3 November 2021]

Environment: Orgalim comments on the draft French Decree on the minimum proportion of reused packaging [28 October 2021]